Skip to content
RUFF-IN
Menu

Process

Plans in, wiring map out

Three steps. No mystery about what was pulled, or where it landed.

  1. 1

    Send the plans

    Send the floor plan and, if you have it, the low-voltage legend and the framing window. We turn that into a room-by-room map: panel, drops, cameras, speakers, and the theater wall. You can see the same map the crew uses.

  2. 2

    We rough it in

    The crew is on site at framing, before insulation and drywall. Cable is pulled and landed. Home runs go back to the structured wiring panel. We do not publish a promised hour count. The visit follows the builder schedule.

  3. 3

    Labeled and walked

    Every run is labeled at both ends. We walk the house with you, or with the superintendent, before the walls close. What is missing gets caught while it is still cheap to fix.

Send a plan set